Work item

Miramar

- 🔬 Lab Jira Task

Basic Information

T-23
DVT
Factory
-0DBM
New
2026-11-20 19:38
2026-11-20 19:38
MDA failure records: 1 unit at ARF · Jira failure rate 0.28% (1/355).
SN GVW62R01645500AA — NTF / Under FA(UFA)
Analysis: Failure Analysis Test iwsinativekazam.wifiradar_trx_chirp_5800_woofer_leakage_60_frame60__leakagepower@-0dbm on device GVW62R01645500AA failed at ARF station during DVT_MAIN phase. Measured leakage power value 999999.000 dBm significantly exceeds upper specification limit of 8 dBm. Failure rate 0.30% (1/336 units). Classified as NTF indicating potential fixture, measurement, or process issue rathe

PQA Mark

your own words — no sync and no AI writes here
PQA Label

Report Fields

Other Information

[Miramar_hq_vn][DVT_MAIN][MDF1][FATP][NTF] iwsinativekazam.wifiradar_trx_chirp_5800_woofer_leakage_60_frame60__leakagepower@-0dbm@ARF

Schedule

Nothing on the calendar for this yet.

Subtasks (0)

No subtasks.

Deliverables / Attachments

No deliverables recorded yet. Paste a picture into a block, or type the final file or folder in Details → Deliverables.
Paste into any box, or drop a file here / click to choose

Linked Page

🔔 Reminder ·