Work item

Miramar

- 🔬 Lab Jira Task

Basic Information

T-37
DVT
Factory
VI1
New
2026-11-20 19:39
2026-11-20 19:39
MDA failure records: 1 unit at VI1 · Jira failure rate 0.24% (1/410).
SN GVW62S0064660060 — Real Fail / Under FA(UFA)
Analysis: Failure Analysis Disassembly revealed FPC gold finger at PIN 10 (IOVCC) damaged and ZIF connector PIN 10 severely deformed. Software unable to identify IC due to connectivity loss. IQC and supplier OQC inspections passed; FPC thickness within spec (0.21mm vs 0.20±0.02mm). Connector assembly confirmed in place. Failure appears related to insertion force or connector design tolerance mismatch during

PQA Mark

your own words — no sync and no AI writes here
PQA Label

Report Fields

edited
edited
edited
edited
edited
edited
edited

Other Information

[Miramar_hq_vn][DVT_MAIN][ASSEMBLY] multiple failures [other@VI1]...

Schedule

Nothing on the calendar for this yet.

Subtasks (0)

No subtasks.

Deliverables / Attachments

No deliverables recorded yet. Paste a picture into a block, or type the final file or folder in Details → Deliverables.
Paste into any box, or drop a file here / click to choose

Linked Page

🔔 Reminder ·