Work item
Miramar
-
🔬 Lab Jira Task
Basic Information
MDA failure records: 1 unit at BFT_MLB · Jira failure rate 0.04% (1/2535).
SN PVW51C0164640071 — NTF / Under FA(UFA)
Analysis: flux residue on BFT2 fixture probes created poor electrical contact. Failure rate 0.05% (1/2222). Unit successfully retested at BFT1, confirming device integrity. Probe contamination identified and cleaned, restoring contact and enabling test passage. Corrective Action Implement mandatory fixture probe inspection and cleaning procedure before DVT line start-up. CM DRI: Adam. Preventive maintenance
PQA Mark
your own words — no sync and no AI writes hereReport Fields
Other Information
[Miramar_hq_vn][DVT_MAIN][MDM1][SMT][NTF] flash_fip_bl2.bin@BFT_MLB
Schedule
Nothing on the calendar for this yet.
Subtasks
No subtasks.
Deliverables / Attachments
No deliverables recorded yet. Paste a picture into a block, or type the final file or folder in Details → Deliverables.
Paste into any box, or drop a file here / click to choose
Linked Page
Create
Owner, start, due, project and the recommended model are filled in
within seconds unless you set them here.
Every
A meeting, reminder or repeating task pops up a loud reminder on any open desk page at the
time you choose, with a Join button when there is a link. The desk has to be open in a tab to ring.
Paste a picture into a text box, or drop files here / click to choose. They stay on this machine.