Amara · 2026-11-20 23:17 · Miramar

Data cut-off: 2026-11-20 14:00 (VN) · Phase: DVT

OVERALL STATUS: YELLOW

1. Overall status and executive summary

Overall quality status is Yellow. FATP yield remains below the 97.5% target, with the primary loss at ACT.

2. Factory data ( Main Build) cut off 2026-11-20 14:00 (VN)

OBA

SMT MLB Production Data

SMT AMPB Production Data

FATP Production Data

3. DVT highlight issues — 0 blocker, 2 critical

Issue 1 : MIRAMAR-1880 — Horizontal convergence angle failure found at ACT. 1.02% [3F/295T]

Issue 2 : Miramar-1890~1893 — LCM issues found at VI1 caused a line stop. (4F/255T at the line-stop window)