Work item

Miramar

- 🔬 Lab Jira Task

Basic Information

T-19
DVT
Factory
AFT
New
2026-11-20 19:38
2026-11-20 19:38
MDA failure records: 3 units at AFT · Jira failure rate 0.80% (3/377).
SN GVW62S0064660079 — WIP / Under FA(UFA)
SN GVW62S0064660067 — WIP / Under FA(UFA)
SN GVW62R016455002T — WIP / Under FA(UFA)
Analysis: Failure Analysis 3 devices (GVW62S0064660079, GVW62S0064660067, GVW62R016455002T) failed inventory_check at AFT. SW check on 11/20 revealed camera ping failure in logs. Failure rate is 0.83% (3/361). Affects both MDF1 and MDF4 build configs. Root cause suspected to be camera assembly issue. Corrective Action Factory and EE teams to verify camera assembly correctness on affected units. CP scheduled

PQA Mark

your own words — no sync and no AI writes here
PQA Label

Report Fields

Other Information

[Miramar_hq_vn][DVT_MAIN][FATP] multiple failures [inventory_check@AFT]...

Schedule

Nothing on the calendar for this yet.

Subtasks (0)

No subtasks.

Deliverables / Attachments

No deliverables recorded yet. Paste a picture into a block, or type the final file or folder in Details → Deliverables.
Paste into any box, or drop a file here / click to choose

Linked Page

🔔 Reminder ·