Work item

Miramar

- 🔬 Lab Jira Task

Basic Information

T-75
DVT
EE
BFT_MLB
New
2026-11-20 19:39
2026-11-20 19:39
MDA failure records: 1 unit at BFT_MLB · Jira failure rate 0.04% (1/2535).
SN PVW51C01646500T9 — Real Fail / Under FA(UFA)
Analysis: Rubra SOC(Bin2),same as EVT MIRAMAR-1484 Same as PVW51C01646500E8 SN:PVW51C01646500T9 1. Check the test log, failed at Error-177:ddr_stress_thermal_control_80 VALUE:FAIL LSL:PASS USL:PASS 2. Retest on fixture BFT_MLB_2 still Failed at Error-177:ddr_stress_thermal_control_80 VALUE:FAIL LSL:PASS USL:PASS 3.According to FPP rules,it is determined to be TF

PQA Mark

your own words — no sync and no AI writes here
PQA Label

Report Fields

Other Information

[Miramar_hq_vn][DVT_MAIN][SMT] ddr_stress_thermal_control_80@BFT_MLB

Schedule

Nothing on the calendar for this yet.

Subtasks (0)

No subtasks.

Deliverables / Attachments

No deliverables recorded yet. Paste a picture into a block, or type the final file or folder in Details → Deliverables.
Paste into any box, or drop a file here / click to choose

Linked Page

🔔 Reminder ·