Work item
Miramar
-
🔬 Lab Jira Task
Basic Information
MDA failure records: 1 unit at ARF · Jira failure rate 0.28% (1/355).
SN GVW62R01645500BX — Real Fail / Under FA(UFA)
Analysis: Under FA 11/19 update The sample can still pass IQC inspection; Next action Send the sample back to CN for the antenna factory to confirm the unit condition and investigate the differences, CP 11/26. 11/18 update According to TRP test results, there is no much difference between NG and OK units. Disassemble the unit and no abnormalities found on antenna in appearance; According to ABA swap, the is
PQA Mark
your own words — no sync and no AI writes hereReport Fields
Other Information
[Miramar_hq_vn][DVT_MAIN][FATP] multiple failures [iwsinativekazam.wifi_11ax_tx1_6355_cbw-20_mcs11_he_su_power_avg@ARF]...
Schedule
Nothing on the calendar for this yet.
Subtasks
No subtasks.
Deliverables / Attachments
No deliverables recorded yet. Paste a picture into a block, or type the final file or folder in Details → Deliverables.
Paste into any box, or drop a file here / click to choose
Linked Page
Create
Owner, start, due, project and the recommended model are filled in
within seconds unless you set them here.
Every
A meeting, reminder or repeating task pops up a loud reminder on any open desk page at the
time you choose, with a Join button when there is a link. The desk has to be open in a tab to ring.
Paste a picture into a text box, or drop files here / click to choose. They stay on this machine.