Work item
Miramar
-
🔬 Lab Jira Task
Basic Information
MDA failure records: 3 units at VI2 · Jira failure rate 4.23% (3/71).
SN GVW62R01645500BU — WIP / Under FA(UFA)
SN GVW62R01645500AE — WIP / Under FA(UFA)
SN GVW62R01645500BL — WIP / Under FA(UFA)
Analysis: Failure Analysis Bright marks on RH concentrated at ACT 2#. Holder inspection revealed scraping risk at bottom and edges during device pick-and-place. Simulated placement confirmed bright marks on both sides of rear cover (1F/5T). Attachments 20261118-161313.jpg and 20261118-161324.jpg provide direct photographic evidence of surface marks with red-box annotations on RH components. Corrective Actio
PQA Mark
your own words — no sync and no AI writes hereReport Fields
Other Information
[Miramar_hq_vn][DVT_MAIN][FATP] multiple failures [other@VI2]...
Schedule
Nothing on the calendar for this yet.
Subtasks
No subtasks.
Deliverables / Attachments
No deliverables recorded yet. Paste a picture into a block, or type the final file or folder in Details → Deliverables.
Paste into any box, or drop a file here / click to choose
Linked Page
Create
Owner, start, due, project and the recommended model are filled in
within seconds unless you set them here.
Every
A meeting, reminder or repeating task pops up a loud reminder on any open desk page at the
time you choose, with a Join button when there is a link. The desk has to be open in a tab to ring.
Paste a picture into a text box, or drop files here / click to choose. They stay on this machine.