Projects / TAG

Hello Amara

I will record everything that's not about a specific project or Task.

ActiveOwner AmaraNo due dateCaptures work mentioning: General stuffs, Personal Memo
Edit project
Quality Notice Report
A notice is sent out one at a time. Pick the product and the build, then choose which notice you are looking at.
No open Quality Notice for this product and build yet. Mark a work item with the “Quality Notice - Open” label and it appears here.
When a Quality Notice is owed
1. Customer Experience
- All HW and SW related OBA issues - some of these escape to customers once OBA moves to sampling (known issues excluded).
- Complaint from Beta users.
- CET.
- Intermittent issue.
- Issue requires a waiver/deviation for shipment.
- A certain quantity of failures will ship to the field; or Beta user / engineering allocation.

2. FATP
- Line stops (quality issues only).
- Major yield issues (NTF and real failures) > 1%.
- Failure modes exceeding failure-rate thresholds.
- Part build holds; line restarted with a second-source supplier.
- Issues caught at RIT that escape to the customer if RIT is removed, with no containment available.
- Intermittent issue.

3. IQC
- Line Verified Rejects above the Line Verified Reject Rate (LVRR) for the commodity.
- DPPM per batch over threshold.
- Intermittent issue.
- Reliability failed thresholds.
- Compliance failure.
- Mitigation of the issue is not aligned with cross-functional teams.
- Safety and privacy issue.
- High risk or big impact to the customer based on QEM and the team's assessment.

常用中文说法
- OBA 新问题(不含已知问题)
- CET 问题
- 出货特采
- 停线问题
- 站位不良 1%
- 主供隔离,需使用二供复线问题
- RIT issue
- IQC 超 DPPM issue
- REL issue
- 安规、法规、认证问题
🔔 Reminder ·